Summary & Lead Time

Summary & Lead Time

This page offers product summary and its lead time base on our production situation in real-time.

The table covers major popular models. For special model the lead time may increase, this mainly related to material status.The table covers major popular models. For special model the lead time may increase, this mainly related to material status.

Upcoming Long Holiday:
New Year’s Day (1 Jan – 3 Jan, 2023)
Expected Delay: 1 Week

Capacity

Max Current in Bold.
  • 10A 277VAC
  • 5A 250VAC / 30VDC
  • 10A 277VAC / 30VDC
  • 20A 277VAC
  • 16A 250VAC
  • 20A 277VAC
  • 20A 250VAC
  • 16A 277VAC / 30VDC
  • 16A 277VAC / 30VDC
  • 20A 277VAC
  • 50A 240VAC / 28VDC
  • 40A 240VAC / 28VDC
  • 40A 240VAC / 28VDC
  • 40A 240VAC / 28VDC

Coil Power

Default in Bold.
  • 0.2W
  • 0.12W ~ 0.18W
  • 0.2W, 0.4W, 0.45W
  • 0.2W, 0.45W
  • 0.36W, 0.45W, 0.6W, 0.8W
  • 0.2W
  • 0.54W
  • 0.54W, 0.72W
  • 0.54W, 0.72W
  • 0.25W, 0.4W
  • 0.9W/1.2VA, 1.2W, 1.6W
  • 0.9W/1.2VA
  • 0.9W/1.2VA
  • 0.9W/1.2VA

Dimension

L x W x H in (mm)s
  • 20.5 x 7.2 x 14.8
  • 20 x 5 x 12.5
  • 20.5 x 10.5 x 15.6
  • 18.4 x 10.2 x 15.4
  • 19 x 15.2 x 15.4
  • 23 x 16.2 x 10.2
  • 29 x 12.6 x 24.2
  • 29.2 x 12.8 x 20.6
  • 29.2 x 12.8 x 20.6
  • 28.8 x 12.5 x 15.5
  • 32.2 x 27 x 19.3
  • 32.2 x 27.5 x 27.8
  • 32.4 x 27.4 x 28.2
  • 32.4 x 27.4 x 19.8

Approval

ROHS 2.0, REACH, TSCA, UCKA
  • UL, TUV
  • N/A
  • UL, TUV
  • UL, TUV
  • UL, TUV
  • UL, TUV
  • N/A
  • UL, TUV
  • UL, TUV
  • UL, TUV
  • UL, TUV
  • UL, TUV
  • UL, TUV
  • UL, TUV

Lead Time

Week(s) / <50Kpcs

Real-time lead time is based on most popular models of each type. For special or uncommon model the lead time could be longer.

Please contact our Sales Engineer for special items' lead time.